Analisis Volume Bekisting Pilar Jembatan Menggunakan Dynamo Revit pada Proyek Jalan Tol
DOI:
https://doi.org/10.31004/riggs.v5i2.10105Keywords:
BIM, Bekisting, Dynamo Revit, Pilar Jembatan, Volume Otomatis, Quantity Take-OffAbstract
Pembangunan infrastruktur jembatan di Indonesia terus berkembang seiring meningkatnya kebutuhan konektivitas, khususnya pada proyek jalan tol yang memerlukan estimasi material secara akurat. Bekisting pilar jembatan merupakan salah satu komponen dengan proporsi biaya yang signifikan sehingga ketepatan perhitungan volumenya berpengaruh terhadap efisiensi anggaran proyek. Metode konvensional berbasis gambar dua dimensi masih banyak digunakan, namun membutuhkan waktu yang relatif lama dan rentan terhadap kesalahan manusia, terutama pada elemen dengan geometri kompleks seperti kolom bertahap, pier head tipe hammerhead, dan haunch. Penelitian ini bertujuan menganalisis volume bekisting pilar jembatan menggunakan integrasi Autodesk Revit 2026 dan Dynamo for Revit 3.6.1.2665 serta membandingkan akurasi dan efisiensi waktunya dengan metode manual. Pemodelan tiga dimensi dilakukan pada elemen kolom, pier head, dan haunch berdasarkan gambar kerja proyek jalan tol aktual. Selanjutnya, skrip visual programming pada Dynamo dikembangkan untuk mengekstraksi luas permukaan bekisting secara otomatis dan mengekspor hasilnya ke Microsoft Excel. Hasil penelitian menunjukkan bahwa metode Dynamo menghasilkan total luas bekisting sebesar 290,60 m² dengan deviasi rata-rata 0,07% dibandingkan metode manual sebesar 290,80 m². Deviasi maksimum terjadi pada komponen haunch sebesar 0,43%, sedangkan komponen lainnya menunjukkan deviasi 0,00%. Dari sisi efisiensi waktu, penggunaan Dynamo mampu mengurangi waktu pengerjaan dari 180 menit menjadi 85 menit atau lebih cepat sebesar 52,8%, dengan efisiensi tertinggi pada proses perhitungan luas permukaan mencapai 88,9%. Dengan demikian, integrasi Revit dan Dynamo terbukti akurat, efektif, dan efisien untuk mendukung digitalisasi quantity take-off pada proyek konstruksi jembatan.
Downloads
References
[1] A. Akcamete, Y. Çepni, dan R. Klein, "Automated BIM-based Formwork Quantity Take-Off," ResearchGate, 2020. [Online]. Tersedia: https://www.researchgate.net/publication/345896054
[2] S. Alathamneh, W. Collins, dan S. Azhar, "BIM-based quantity takeoff: Current state and future opportunities," Automation in Construction, vol. 165, 2024. https://doi.org/10.1016/j.autcon.2024.105549
[3] M. F. A. Arifin, D. P. Oktaviani, A. Budiwirawan, dan L. T. Ilingono, "Modeling and Analysis of Column Formwork Construction Components Using Dynamo Revit," Aceh International Journal of Science and Technology, vol. 13, no. 3, hlm. 233–246, 2025. https://doi.org/10.13170/aijst.13.3.42925
[4] R. Baskova, A. Tazikova, Z. Strukova, M. Kozlovska, dan J. Cabala, "A Dynamic Model for Effective and Optimal Planning of Formwork in Construction Projects," Buildings, vol. 13, no. 7, 2023. https://doi.org/10.3390/buildings13071794
[5] K. Das, S. Khursheed, dan V. K. Paul, "The impact of BIM on project time and cost: insights from case studies," Discover Materials, vol. 5, no. 1, 2025. https://doi.org/10.1007/s43939-025-00200-2
[6] P. Gappmaier, S. Reichenbach, dan B. Kromoser, "Advances in formwork automation, structure and materials in concrete construction," Automation in Construction, vol. 162, 2024. https://doi.org/10.1016/j.autcon.2024.105373
[7] V. J. L. Gan, "BIM-based graph data model for automatic room layout design and space planning," Automation in Construction, vol. 138, 2022. https://doi.org/10.1016/j.autcon.2022.104210
[8] Z. Huszár dan É. Lublóy, "Examination of the cost ratio of the formwork," Acta Technica Jaurinensis, vol. 14, no. 2, hlm. 155–170, 2021. https://doi.org/10.14513/actatechjaur.00598
[9] C. Khosakitchalert, N. Yabuki, dan T. Fukuda, "Improving the accuracy of BIM-based quantity takeoff for compound elements," Automation in Construction, vol. 106, 2019. https://doi.org/10.1016/j.autcon.2019.102891
[10] B. Lee, H. Choi, B. Min, J. Ryu, dan D. E. Lee, "Development of formwork automation design software for improving construction productivity," Automation in Construction, vol. 126, 2021. https://doi.org/10.1016/j.autcon.2021.103680
[11] V. H. Pham, P. H. Chen, Q. Nguyen, dan D. T. Duong, "BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning," Buildings, vol. 14, no. 12, 2024. https://doi.org/10.3390/buildings14124021
[12] R. Rocha dan L. Mateus, "Using Dynamo for Automatic Reconstruction of BIM Elements from Point Clouds," Applied Sciences, vol. 14, no. 10, 2024. https://doi.org/10.3390/app14104078
[13] R. Saavedra, W. Meléndez, dan G. Garcés, "Comparative Analysis of Quantity Take-Off in Concrete, Steel Bars and Formwork in Apartment Buildings Based on CAD and BIM Methodologies," Journal of Information Technology in Construction, vol. 30, hlm. 159–184, 2025. https://doi.org/10.36680/j.itcon.2025.008
[14] P. Smith, "BIM Implementation – Global Strategies," Procedia Engineering, vol. 85, hlm. 482–492, 2014. https://doi.org/10.1016/j.proeng.2014.10.575
[15] M. Valinejadshoubi, O. Moselhi, I. Iordanova, F. Valdivieso, dan A. Bagchi, "Automated system for high-accuracy quantity takeoff using BIM," Automation in Construction, vol. 157, 2024. https://doi.org/10.1016/j.autcon.2023.105155
[16] G. T. N. Veerendra, B. Choudhary, dan R. P. Singh, "A comprehensive review of BIM-enabled quantity surveying practices in construction projects," Asian Journal of Civil Engineering, 2024. https://doi.org/10.1007/s42107-024-01032-6
[17] Y. Weng, N. A. N. Mohamed, B. J. S. Lee, N. J. H. Gan, M. Li, M. J. Tan, H. Li, dan S. Qian, "Extracting BIM Information for Lattice Toolpath Planning in Digital Concrete Printing with Developed Dynamo Script," Journal of Computing in Civil Engineering, vol. 35, no. 3, 2021. https://doi.org/10.1061/(asce)cp.1943-5487.0000964
[18] S. Du, F. Teng, Z. Zhuang, D. Zhang, M. Li, H. Li, dan Y. Weng, "A BIM-enabled robot control system for automated integration between rebar reinforcement and 3D concrete printing," Virtual and Physical Prototyping, vol. 19, no. 1, 2024. https://doi.org/10.1080/17452759.2024.2332423
[19] S. H. Chen dan F. Xue, "Review and future directions of cross-disciplinary BIM research," Advanced Engineering Informatics, vol. 56, 2023. https://doi.org/10.1016/j.aei.2023.101966
[20] J. Xia, K. Shan, X. Wu, R. Gan, dan W. Jin, "Shear-friction behavior of concrete-to-concrete interface under direct shear load," Engineering Structures, vol. 238, 2021. https://doi.org/10.1016/j.engstruct.2021.112211
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Miguel Aryo Neshano Pratama, Muhammad Faizal Ardhiansyah Arifin

This work is licensed under a Creative Commons Attribution 4.0 International License.