[1]
D. A. Fahreza and M. F. A. Arifin, “Analisis Durasi Penjadwalan Linear Scheduling Method Berdasarkan Permen PUPR No.73 Tahun 2023 Pada Pembangunan Gedung”, RIGGS, vol. 5, no. 1, pp. 1437–1444, Feb. 2026.