[1]
Kosasih, M.A.A. and Arifin , M.F.A. 2026. Analisis Waktu Pelaksanaan berdasarkan Kapasitas Produksi Alat pada Proyek Konstruksi Kereta Layang. RIGGS: Journal of Artificial Intelligence and Digital Business. 5, 1 (Mar. 2026), 8187–8194. DOI:https://doi.org/10.31004/riggs.v5i1.6959.